As a manager at FVH, a company specializing in the construction of incubators, I played an integral role in the project. I carried out the electrical installation and configuration of the central computer of the incubator, including the connection of motors, sensors and devices. In addition, I conducted extensive quality control testing to ensure the optimal performance of all
realização principalFor me, a personal achievement was to maintain the adequate levels of carbon dioxide (CO2) in the incubation environment, I developed and configured a real-time CO2 monitoring system. This system made it possible to accurately measure and control CO2 levels within each incubator.
At the ELELCOM company, I had the opportunity to work at the Athens cement plant , where I played a key role in the inspection and preventive maintenance of the motors. In addition, I carried out the installation and programming of sprinklers for the automated cleaning of Page 1 of 2 the level sensors in the cement silos. These activities contributed significantly to the optimal functioning
realização principalAt ELELCOM, one of my achievements at the Atenas cement plant. During my time there, I successfully programmed some air sprinklers using PLC Logo. These air sprayers played a crucial role in keeping the level sensors in the cement silos clean.