Being a project manager, materials control was carried out with contractors, projections, presentations and cost estimation.
As a project manager, economic models were made that controlled the entire economic margin of the projects led, presentations, control panels, searches for reports, etc. were made.
To carry out the road map, the Arpu and to estimate the costs of products and the ROI of each of these