Telecommunications engineer with experience in the implementation of Scada platforms for the control and monitoring of industrial processes. I have more than 10 years of experience in industrial instrumentation of processes and telemetry systems
Design and implementation of an optical fiber half ring for the Drinking Water Treatment Plant (PTAP). Audit of the automation and instrumentation area linked to the construction project of the Palmira Wastewater Treatment Plant (WWTP). Audit of the optimization project for the coagulant dosing process for the Drinking Water Treatment Plant (PTAP). Interventory to the project of implementation of phase II for the optimization of the co
- Selection, installation and start-up of electronic instruments for variables such as: level, pressure, flow, turbidity, pH, chlorine, among others. - Assembly, configuration and start-up of electric actuators for the control of valves - Preventive maintenance of the instrumentation associated with the processes of production and distribution of drinking water - Verification of adequate instrumentation for variables of level, flow, pressure, turbidity, among other
- Provide maintenance service to electrical and mechanical equipment - Comply with preventive maintenance programs associated with the quality management system - Specify electromechanical equipment to optimize processes associated with the production of drinking water - Test of motors and electrical machinery to guarantee their operation